Systems Diagrams and Visualization Project

SystemsDiagrams and Visualization Project

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Create the following UML diagrams to visualize the process of completing the IT project from the previous

exercise (providing IT services for a new building):

• Use Case diagram

• Activity diagram

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

• Communications diagram

• Data Flow diagram

Assume the following basic processes:

1. Procurement of all resources.

2. Setup of PCs and network servers.

3. Deployment and Testing of resources to the IT Area/Office.

4. Deployment and Testing of resources to the Administrative Area.

5. Deployment and Testing of resources to the Conference Room.

6. Deployment and Testing of resources to the Meeting Room.

7. Deployment and Testing of resources to the Individual Offices.

8. Deployment and Testing of resources to the Computer Labs.

9. Testing of all Other Locations.

• Create a Use Case diagram to show all actors and the basic processes above

o Procurement, Setup, Deployment & testing of each major location.

• Create an Activity diagram to show the deployment and testing of resources into the Computer Labs

o Network connectivity testing requires interaction between the PC and Network Specialist

o Projector connectivity testing requires interaction between the PC and AV

Specialist.

• Create a Communications diagram to show collaboration between the PC Specialist, the Network Specialist

and the AV Specialist during deployment and testing of resources into the Computer Labs.

o If network connectivity issues arise, the PC Specialist will communicate with the Network

Specialist.

o If projector connectivity issues arise, the PC Specialist will communicate with the AV Specialist.

• Create a Data Flow diagram to show the Procurement of all resources, based on this additional information:

o The PC Specialist enters all purchases into the Purchase Application system once the resources

are purchased.

o The PC Specialists closes all purchases in the Purchase Application system once the resources

are received.

ITProject

This project simulates the Analysis and Planning needed to provide IT services for a new building. The student

must submit a Project Schedule based on the Project Requirements and details below.

1. Using the attached MS Word table template, create a project schedule. The project schedule will need

the following columns: WBS; Task #; Task Action; Duration; Predecessor; and Resources.

2. Do not go beyond the scope identified below. The project only covers tasks identified below.

Background: IT has been notified that a new office building is ready for occupancy. All telecommunication

cables are in place. Rooms are equipped to provide access to the network once the network servers are

installed. Wireless routers are installed throughout the building to provide wireless access once the network

servers are installed. VOIP phones and vendor-supplied networked copier are already ordered.

NOTE: note specifications may contain multiple actions/tasks. Break them down into separate rows and group

similar actions into a block of tasks (i.e., Purchase Resources; Setup Equipment; etc.).

Project Specifications:

• Purchase, setup, deploy and test network servers that will be managed in the new building’s IT area.

o Setup includes loading and testing network software at corporate IT before deployment.

o Test network servers in the new building after deployment.

o NOTE: Network servers must be installed and operational before other devices can be tested

for internet and wireless connectivity.

• Purchase, setup, deploy and test Desktop PCs and Laptops in offices, labs and administrative areas.

o Setup includes loading and testing corporate software at corporate IT before deployment.

o Test all systems and ensure they can access the network once deployed.

o Test all wireless systems and ensure they can access the wireless routers.

• Purchase, deploy and test wireless Projectors.

o Test all Projectors to ensure desktops can access them via direct cabling.

o Test all Project to ensure mobile laptops can access them wirelessly.

• Purchase, deploy and test VOIP phones (they use the network to receive/generate phone calls).

o Test all phones to ensure they function properly across the network.

• Test networked Printers/Copiers once they are delivered by the lease vendor.

o Test all printers/copiers to ensure they can print documents sent across the network.

The COO has determined the following rules to facilitate occupancy:

• IT Area must be ready first. Deploy and test network servers and desktop PC three weeks before any

other location.

• Administrative Areas must be ready second. Deploy and test their desktop PCs and VOIP phones one

week before remaining locations.

• Conference & Meeting Rooms must be ready third. Deploy and test their desktop PCs, VOIP

phones and wireless projectors five days before the remaining locations.

• Offices and labs are last. Deploy and test their desktop PCs, VOIP phones and wireless projectors

before occupancy.

Project Details: The new building includes the IT Area, Computer Labs, Administrative Areas, Individual

Offices, a Conference Room, and a Public Meeting Room.

IT Area: resources include

• 4 network servers

• 1 desktop PC

• 2 laptops

• 2 VOIP phones

Administrative Areas: 2 administrative areas will each have

• 4 workstations, each with a desktop PC, networked via a network port

• a VOIP phone for each of the 4 workstations

• a vendor-supplied networked copier

Conference Room. The conference room has

• a wireless ceiling-mounted Projector

• network connectivity via a network cable and a wireless access point

• a VOIP phone

Meeting Room. The meeting room has

• a wireless ceiling-mounted Projector

• 1 desktop PC with network connectivity via a network cable.

• 2 VOIP phones (one near the lectern and the other wall mounted at the entrance

Individual Offices: 40 offices will each have

• a desktop PC networked via a network port

• a VOIP phone

Computer Labs: 2 computer labs will each have

• a wireless ceiling-mounted Projector

• a desktop PC, networked via a network port, and directly cabled to the Projector

• 25 desktop PCs networked via a network port

• a VOIP phone

• a vendor-supplied networked copier

Personnel Assignments

PC Specialist (equipment purchase, software setup and PC support):

o purchase, setup and installation of new laptops and desktop computers and corporate software

o purchase of all projectors

o work with Network Specialist to ensure network access is available on all computers and

networked

printers

Network Specialist (Telecomm support):

o setup and installation of network servers and all VOIP phones

o work with PC Specialist to ensure network access is available on all computers and networked

printers

AV Specialist (A/V requirements):

o Installation of all wireless projectors

o work with PC Specialist to ensure projectors can be accessed by appropriate computers

Take time to think about how the work of the Specialists will be conducted.

• Understand how the occupancy rules affect the schedule timeline.

o Since some locations are occupied at different times, handle the deployment and testing of

resources for each location separately (i.e. IT Area separate from Admin Area; Conference Room,

Meeting Room, etc.).

• Make sure you satisfy all project specifications.

• The PC Specialist, Network Specialist and AV Specialist can be completing tasks concurrently and it is quite

possible that one specialist will have to wait while another specialist completes a task.

• The schedule must include a milestone for each block of tasks (Purchase Resources, Setup Equipment,

Deploy and Test).

o Each resource (network servers, computers, projectors) must be purchased separately since

they will come from different vendors. The VOIP phones and third-party network printers are

already ordered and just need to be tested once they arrive.

o Note: a single task may be used for a resource that is tested at a specific time (i.e. the testing of

all computers for administrative areas can be a single task; or the testing of all computer for the

2 computer labs can be a single task). However, a single task cannot be used when an action

must be done during different occupancy periods (i.e., testing of IT Area resources is a separate

task from testing of Administrative Areas, etc. since they take occupancy at different times.)

• Task Actions must start with a verb and describe the action (i.e., Test VOIP phones)

o Milestones do not start with verbs and have a zero duration.

• When creating the schedule, use your best guess in determining Duration. Use a single measure (i.e.,

min.) for all tasks.

• Resources must include both the people (title of the IT Specialist) and specific resource(s).

• When creating Predecessors, point to the respective Task # (not the WBS number). It is not necessary

to include a task that is already a predecessor of another task (i.e. consider the following tasks: 1:

Order food, 2: Eat food, 3: Cleanup. The predecessor for 2 is 1. The predecessor for 3 is 2 (i.e. 2

already has a predecessor of 1).

o Note: be careful about predecessors. Not only are they directly related to the tasks that

proceed them within a Milestone but they may be directly related to tasks within other

Milestones (example: network servers must be operational before other equipment can be

tested for network connectivity – look for other dependencies described above).

• The WBS should be completed once the schedule is in its final version.

1

1

2

1

2

3

Network specialist

4

Network specialist

1

20

min

5

6

7

Test the network

60 min

8

9

10

120 min

11

60 min

11

Network specialist

60 min

12

Network specialist

Mounting wireless projector

13

AV specialist, projector

Set VOIP

120 min

14

VOIP, network specialist

60 min

15

Network specialist

16

Network specialist

17

Network specialist

18

19

Network specialist

1200 min

20

Network specialist

Network specialist

Network specialist

60 min

Network specialist

Network specialist

60 min

120 min

Network specialist

Project Schedule – IT services for a new building

WBS

Task #

Task Action

Duration

Predecessor

Resource

1

.0

1

Purchase network servers, desktop, laptops, VOIP, Projectors, and printers/copiers

1

4

40

PC specialist

2

.0

2

set up IT area

leave duration blank – subordinate tasks identify actual duration
leave predecessor blank – no predecessor
leave resource blank – put in subordinate tasks

2.1

set up network server

3

6

0 min

PC specialist

2.1.1

Deploy network server

3

60 min

Servers, network specialist

Use the same measure for all durations(Min or Hrs.)

2.1.2

3

Test network servers

60 min

Network specialist

Set up completed

7

8

0 min

3.0

Setup administrative area

3.1

4

Assemble computers for 4 work station

240 min

3.1.1

5

connect the computers to the network

12

0min

3.1.2

6

Test the network

Network specialist

, network testers

3.2

7

Assemble VOIP in the four work station

60min

Network specialist

3.2.1

8

Connect VOIP to the network

120 min

Network specialist , VOIP,

3.2.2

9

This is a milestone with zero duration

4Set up complete

720 min

4.0

Set up conference

4.1

10

Mounting wireless projector

18

0 min

AV specialist

, projector

4.2

11

Set VOIP

VOIP, network specialist

4.3

12

Set wireless access point

4.4

13

Test connection

Conference room set up complete

5.0

Set up meeting room

5.1

14

180 min

5.2

15

Use the same measure (Min or Hrs.)

5.3

16

Set wireless access point

5.4

17

Test connection

60 min

Meeting room set up complete

420

6.0

Set up offices

6.1

18

Assemble computers in 40 offices

2400 min

6.2

19

Assemble VOIP in 40 offices

2400 min

VOIP, and Network specialist

6.3

20

Connect the devices to the internet

1200 min

6.4

21

Test the connection

Set up complete

7200 min

7.0

Set up computer lab

7.1

Amble 26 Desktop computer in various work station

1560 min

7.2

Set up VOIP

7.3

Set up vendor supplied copier

30min

7.4

Set up wireless projector

AV specialist

7.5

Connected desktops and VOIP to the network and

Computer labs set complete

Order a unique copy of this paper

600 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
Top Academic Writers Ready to Help
with Your Research Proposal

Order your essay today and save 25% with the discount code GREEN