Unit Outcomes:
Course Outcome:
IT460–3: Create logical models that describe system processes.
Assignment Instructions
Avery has opened a gym and rehabilitation center specifically designed to provide training and recovery for service members who may have been injured while on duty. New members are provided a free fitness assessment to help determine their current fitness levels and to ascertain the extent of any injury to help onboard them into the program.
Avery has designed a basic system to help onboard these new gym members. When members are seen for the first time, they complete a simple gym membership form that asks for their name, address, phone number, and brief medical history, which are stored in the gym member file. They are also asked to schedule a Fitness Assessment.
Therapists or trainers must check the assessment calendar file for an available time. Members may also call to change their assessments. Because these assessments are scheduled in advance, Avery usually sends a reminder postcard and text message to each member one week before the appointment.
Assignment Requirements
Use Visio to Construct a Level 1 DFD based on the attached use cases. Each use case corresponds to a process in the Gym System. Use Gane and Sarson symbols. All the information can be analyzed from the Use Cases. Some of the Information is provided below. You will have to determine and label all the Data Flows in the DFD.
Entity:
Gym Member
Processes:
Data Files:
Calendar
File
At least 16 are needed
IT460: Unit 5 Assignment Data Flow Diagrams
Use Case
Name
: Gym Member makes or changes a fitness assessment
ID: _1_
Importance Level: High
Primary Actor: Gym Member
Short
Description
: This describes how a new fitness assessment is made or an existing fitness assessment is changed.
Trigger: Gym Member calls to schedule new fitness assessment or change an existing fitness assessment.
Type: External/Temporal
Major Inputs:
Major Outputs:
Description
Source
Description
Destination
Gym Member name
Gym Member
Scheduled fitness assessment
Gym Member
Desired fitness assessment
Gym Member
Scheduled fitness assessment
Calendar file
Fitness assessment
to change
Gym Member
Available fitness assessments
Gym Member
Available fitness assessments
Calendar file
Check Gym Member name
Gym Member file
Existing Gym Members
Gym Member file
Major Steps Performed
Get desired fitness assessment time and match with available fitness assessments in
. When a suitable time is found, enter scheduled fitness assessment in the Calendar file and confirm with Gym Member.
Information for Steps
Gym Member name
Gym Member File
Address
Phone number
New Gym Member information
Fitness assessment to change
Existing Fitness assessments
Desired fitness assessment
Available fitness assessments
Scheduled fitness assessments
Use Case Name: Collect new Gym Member information
ID: _2_
Importance Level: High
Primary Actor: New Gym Member
Short Description: This describes how new Gym Member information is collected when a new Gym Member arrives for fitness assessment.
Trigger: New Gym Member arrives for fitness assessment.
Type: External/Temporal
Major Inputs:
Major Outputs:
Description
Source
Description
Destination
New Gym Member information
Gym Member Information
Gym Member file
(Includes name, address,
Gym Member
phone number)
Injury History
Gym Member
Major Steps Performed
Information for Steps
Gym Member status
Gym Member name
Address
Phone number
Injury history
Use Case Name: Send fitness assessment reminder card and text message
ID: _3_
Importance Level: Medium
Primary Actor: System
Short Description: This describes how reminder cards and text message sent to Gym Members one week prior to fitness assessment.
Trigger: Time to send reminders and text message one week before scheduled fitness assessments.
Type: External/Temporal
Major Inputs:
Major Outputs:
Description
Source
Description
Destination
Current date
Calendar
Fitness assessment notification card
Gym Member
Scheduled fitness assessments
Calendar file
Text message
Gym Member
Gym Member Contact Info
Gym Member file
Major Steps Performed
Information for Steps
Current date
Scheduled fitness assessments
Name
Address
Fitness assessment
Fitness assessment notification card
2/5/22, 1:37 PM Unit 5 Assignment Dropbox – IT460 Systems Analysis and Design – Purdue University Global
https://purdueglobal.brightspace.com/d2l/lms/dropbox/user/folder_submit_files.d2l?db=1068886&grpid=0&isprv=0&bp=0&ou=201178 1/5
IT460 Unit 5 Assignment Rubric
Course: IT460 Systems Analysis and Design
Criteria 1
Level III
10 points
Level II
8.5 points
Level I
6 points
Not Present
0 points
Criterion Score
Criteria 1:
Create Data
Flow
Diagrams:
Fundamentals
/ 10Meets all
criteria:
• Context level
Data Flow
Diagram was
created
describing the
case study.
• Consistent
symbols (Gane
and Sarson
recommended)
were used.
• Gym member
entity created.
Meets two
criteria:
• Context level
Data Flow
Diagram was
created
describing the
case study.
• Consistent
symbols (Gane
and Sarson
recommended)
were used.
• Gym member
entity created.
Meets one
criterion:
• Context level
Data Flow
Diagram was
created
describing the
case study.
• Consistent
symbols (Gane
and Sarson
recommended)
were used.
• Gym member
entity created.
Does not meet
any criteria.
Criteria 2
Level III
15 points
Level II
12.75 points
Level I
9 points
Not Present
0 points
Criterion Score
2/5/22, 1:37 PM Unit 5 Assignment Dropbox – IT460 Systems Analysis and Design – Purdue University Global
https://purdueglobal.brightspace.com/d2l/lms/dropbox/user/folder_submit_files.d2l?db=1068886&grpid=0&isprv=0&bp=0&ou=201178 2/5
Criteria 2
Level III
15 points
Level II
12.75 points
Level I
9 points
Not Present
0 points
Criterion Score
Criteria 2:
Create Data
Flow
Diagrams:
Processes
/ 15• Three
processes were
successfully
created as part
of the context
level data flow
diagram:
o Make or
Change Fitness
Assessment
Process.
o Collect New
Gym Member
Information
Process.
o Send
Assessment
Reminder card
and text message
Process.
• Two processes
were successfully
created as part
of the context
level data flow
diagram:
o Make or
Change Fitness
Assessment
Process.
o Collect New
Gym Member
Information
Process.
o Send
Assessment
Reminder card
and text message
Process.
• One process
was successfully
created as part
of the context
level data flow
diagram:
o Make or
Change Fitness
Assessment
Process.
o Collect New
Gym Member
Information
Process.
o Send
Assessment
Reminder card
and text message
Process.
Does not meet
any criteria.
Criteria 3
Level III
5 points
Level II
4.25 points
Level I
3 points
Not Present
0 points
Criterion Score
2/5/22, 1:37 PM Unit 5 Assignment Dropbox – IT460 Systems Analysis and Design – Purdue University Global
https://purdueglobal.brightspace.com/d2l/lms/dropbox/user/folder_submit_files.d2l?db=1068886&grpid=0&isprv=0&bp=0&ou=201178 3/5
Criteria 3
Level III
5 points
Level II
4.25 points
Level I
3 points
Not Present
0 points
Criterion Score
Criteria 3:
Create Data
Flow
Diagrams:
Data stores
/ 5Three elements
related to data
stores were
correctly created
as part of the
Context level
Data Flow
Diagram:
• Two datastores
were correctly
created:
Calendar File
Data store
and
Gym member file
Data
stores.
• Data flows
were correctly
created into and
out of the data
stores.
• They were
connected to
appropriate
processes.
Two elements
related to data
stores were
correctly created
as part of the
Context level
Data Flow
Diagram:
• Two datastores
were correctly
created:
Calendar File
Data store and
Gym member file
Data stores.
• Data flows
were correctly
created into and
out of the data
stores.
• They were
connected to
appropriate
processes.
One element
related to data
stores was
correctly created
as part of the
Context level
Data Flow
Diagram:
• Two datastores
were correctly
created:
Calendar File
Data store and
Gym member file
Data stores.
• Data flows
were correctly
created into and
out of the data
stores.
• They were
connected to
appropriate
processes.
Does not meet
any criteria.
Criteria 4
Level III
15 points
Level II
12.75 points
Level I
9 points
Not Present
0 points
Criterion Score
2/5/22, 1:37 PM Unit 5 Assignment Dropbox – IT460 Systems Analysis and Design – Purdue University Global
https://purdueglobal.brightspace.com/d2l/lms/dropbox/user/folder_submit_files.d2l?db=1068886&grpid=0&isprv=0&bp=0&ou=201178 4/5
Total / 50
Criteria 4
Level III
15 points
Level II
12.75 points
Level I
9 points
Not Present
0 points
Criterion Score
Criteria 4:
Create Data
Flow
Diagrams:
Data Flows
/ 15All components
of Data Flows
were created as
part of the
context level
data flow
diagram,
including:
• At least 16
data flows.
• Correctly
named following
appropriate
naming
conventions.
• Logical flow to
and from
entities,
processes, and
data stores.
Two elements of
the following
were correctly
concluded:
• Between 8–15
data flows
• Correctly
named following
appropriate
naming
conventions.
• Logical flow to
and from
entities,
processes, and
data stores.
One element of
data flows was
correctly
completed:
• Between 1–7
data flows
• Correctly
named following
appropriate
naming
conventions.
• Logical flow to
and from
entities,
processes, and
data stores.
Does not meet
any criteria.
Criteria 5
Level III
5 points
Level II
4.25 points
Level I
3 points
Not Present
0 points
Criterion Score
Criteria 5:
Presentation
and
formatting
/ 5Meets all
criteria:
• Visio was used
• Follows logical
rules for
connecting
elements of the
context level
diagram.
• The diagram is
easy to read and
follow.
Meets two
criteria:
• Visio was used
• Follows logical
rules for
connecting
elements of the
context level
diagram.
• The diagram is
easy to read and
follow.
Meets one
criterion:
• Visio was used
• Follows logical
rules for
connecting
elements of the
context level
diagram.
• The diagram is
easy to read and
follow.
Does not meet
any criteria.
2/5/22, 1:37 PM Unit 5 Assignment Dropbox – IT460 Systems Analysis and Design – Purdue University Global
https://purdueglobal.brightspace.com/d2l/lms/dropbox/user/folder_submit_files.d2l?db=1068886&grpid=0&isprv=0&bp=0&ou=201178 5/5
Overall Score
Level III Max Points
42.51 points minimum
Level II Max Points
30.01 points minimum
Level I Max Points
1 point minimum
Not Present
0 points minimum