Excel homework

There is a link which has the steps of how to do the homework

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

   http://speedy.sh/ecQea/QA-458-1st-Assignment.rar

 

Also, please read the files direction carfully 

TECH 458 Quality Assurance

Save Time On Research and Writing
Hire a Pro to Write You a 100% Plagiarism-Free Paper.
Get My Paper

Department of Engineering and Design

Eastern Washington University

Spring Quarter 2013

Assignment 1 & Help Sheet (30 Points)

Assignment:

You will complete an x-bar and R chart similar to the example shown in Chapter 6, figure 6.8, from our textbook “Statistical Process Control and quality Improvement”, starting from the provided Excel template. Two versions of the assignment template are provided; 1A is for the newer version of Excel: .xlsx, 1B is compatible for older versions of Excel: .xls. You will enter the numerical data from the section below, and calculate all of the averages and ranges, then plot these numbers and add the connecting lines, in the appropriate chart sections. You will also calculate and plot the UCLX, LCLX, UCLR, and LCLR. The control limit formulas are on page 203 of the textbook. Be sure to
include
your upper and lower control limit
calculations
below the chart.

Numerical Data:

908

908

926

896

912

912

882

905

900

890

910

900

925

885

926

913

917

903

898

915

892

895

913

930

917

889

903

912

896

1

2

3

4

5

6

7

8

9

10

11

12

13

14

908

900

905

892

896

930

890

918

912

907

913

940

941

926

911

889

901

882

903

917

884

910

902

895

925

914

919

945

915

936

934

885

862

873

955

933

871

898

928

909

894

895

895

896

917

885

918

890

892

885

908

895

909

916

917

909

896

911

912

894

928

910

900

914

915

902

916

920

925

915

925

912

892

904

920

920

906

907

890

897

917

15

16

17

18

19

20

21

22

23

24

25

942

916

922

904

891

897

893

960

923

920

906

950

888

879

951

Formatting:

Text Size: All of the text in this assignment has been preset to the individual cells.

Margins: The margins have been preset in this assignment. If you file does not display correctly, you will need to change the page setup. The top, bottom, and right side are set for ¼’ (0.25) margins. The left margin is set to ½” (0.5”). The view is set to normal; the page is set to US Legal, landscape, and fit to page.

Name Block: Place the name block in the
upper left
corner of the page, in cells A1 through A3. Put your
name first
, then the
class title
and then the due
date
, as per the example:

Your Name

TECH 458 Quality Assurance

May 9, 2013

Saving/Naming Your File:

When you save your file make sure that your name and the project number are included in it.

Example: YourName458Asgnmt1

Because of problems with Blackboard, use only letters and numbers in the file name.

Due Date: May 9, 2013

Revised 4/29/2013 TG Page 1

2

>Asgnmt

1

Number

1 2

Sample
Sample 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Measurements
Average
Range
Chart of Averages
Chart of Ranges
UCLX=
LCLX=
UCLR=
LCLR=

2

>Asgnmt

1

Number

1 2

Sample
Sample 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Measurements
Average
Range
Chart of Averages
Chart of Ranges
UCLX=
LCLX=
UCLR=
LCLR=
Order your essay today and save 25% with the discount code: STUDYSAVE

Order a unique copy of this paper

600 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
Top Academic Writers Ready to Help
with Your Research Proposal

Order your essay today and save 25% with the discount code GREEN